Projects by Jako Industries

Mechanical Services Contractor Western Australia

Woolworths Belmont

The project comprised of the full replacement of Mechanical Services plant and equipment including new mechanical services switchboards whilst maintaining minimal store disruptions. Project required Jako to replace a redundant built up air handling unit with two (2) new packaged units and supplementary in-ceiling and ceiling cassette Daikin units. Ductwork

Bethesda

The project involved the construction of a five-storey Mental Health Clinic to provide comprehensive and multidisciplinary state-of-the-art Mental Health care in Perth’s south for both overnight and day patients.

West Australian Institute of Sport

The project entailed construction of a new high performance centre for the West Australian Institute of Sport (WAIS). The state of the art facility would provide WAIS with the technology and facilities to train high performance athletes to the levels required for competition on an international stage.

Western Diagnostic

The project involved the construction new Pathology laboratory and head office for Western Diagnostic Pathology. The project was carried out in two parts with the base build portion incorporating all main plant and equipment and fitout incorporating the specific systems serving the specific operational requirements.

Harry Perkins External facade of building

Harry Perkins Institute for Medical Research (North Building)

The basement fitout of the Harry Perkins facility for medical research was designed and constructed to facilitate a small animals research facility with a PC3 rating.

University of Western Australia — Science Library

University of Western Australia — Science Library

The project consisted of the construction on a new Biological sciences library on the Crawley Campus of the University of Western Australia.

South Metropolitan Regional Council

This project entailed design, manufacture and installation of mechanical exhaust systems serving the Waste Recovery Centre in Canning Vale.

St John of God Hospital Redevelopment

SJOG Murdoch Redevelopment

The project comprised of a new South Wing consisting of 160 additional beds including a dedicated Cancer Centre, new 7 storey medical centre and extension of the existing hospital to include new operating theatres, endoscopy, ICU/CCU departments and a new Central Plant Room.

Rockingham and Kwinana Hospital

Rockingham and Kwinana Hospital Stages 1 and 3

Multiple new and refurbished buildings to serve the emergency department, night stay ward, children’s ward and mental health.